ACIS Internal Memo 61-80
PS 61 (1/23/95) MWB
- "The Electron Storage Ring Bessy as a Primary Standard Soruce -
a Radiometric Comparison against a Cryogenic Electrical
Substitution Radimeter in the Visible" Thornagel et al.
PS 62 (1/27/95) GRR
- Frontside/Backside CCD Science Analysis, J. Nousek
PS 63 (2/7/95) MWB
- Rec's of ACIS Team Concerning Back-Illuminated CCDs for ACIS
PS 64 (2/17/95) MWB
- ACIS Flexprint Schematics and Wire List
PS 65 (2/22/95) MWB
- Draft: CCD Screening Requirements + Measurement Plan
PS 66 (3/20/95) MWB
- Sci. Req's for Calibration of AXAF
PS 67 (3/21/95) MWB
- Summary of Trip to PTB/Bessy for CCD Calibration 5-12 March 95.
PS 68 (4/4/95) MWB
- CCID-17 Gate Structure Dimensions
PS 69 (5/4/95) GYP
- Some HIREFS Results
PS 70 (5/4/95) SJONES
- High Energy X-ray Tube
PS 71 (5/4/95) JWW
- ACIS Data Analysis + Database
PS 72 (5/4/95) TI
- Quantum Efficiency: Energy Choice
PS 73 (5/4/95) ARASMUS
- Response Matrix
PS 74 (5/9/95) MWB
- ACIS CCD Channel Stop Dimensions
PS 75 (5/4/95---5/24/95) SJONES
- High Energy X-ray Tube: Replaced version (5/24/95)
PS 76 (5/4/95---5/24/95) SJONES
- Tritium X-ray Source: Replaced version (5/24/95)
PS 77 (5/9/94) MWB
- DRAFT CCD Screening Requirements + Measurement Plan
PS 78 (6/14/95) MWB
- Preliminary Contamination Control Action from Matt Smith
PS 79 (6/26/95) ARASMUS
- X-ray CCD Simulations: Pix-Dist and ACIS Pix-Dist
PS 80 (7/10/95) MWB
- Draft CCD Calibration Requirements + Measurement Plan
PS 80a (7/19/95) MWB
- Revised Draft CCD Calibration Requirements + Measurement Plan
ACIS Group Home Page
Previous List Page
Next List Page