ACIS Internal Memo 21-40

PS 21 (1/19/94) MWB
Measured Plans for ACIS Back Illuminated Test CCDs
PS 22 (1/24/94) MWB
Thoughts on ACIS Mechanized GSE from MMtG Ltd. Dist.
PS 23 (2/9/94) MWB
CCID 10 Description
PS 24 (2/18/94) BJ
CCD Charge Diffusion Effects
PS 25 (2/18/94) MWB
Notes form Calibration Implementation Mtg 2/15/94
PS 26 (2/23/94) MWB
Acis Optical Surface Cleanliness Requirements
PS 27 (3/1/94) MWB
Camera Body Venting + Contamination Scot Anderson
PS 28 (3/15/94) MWB
ACIS Focal Plane Materials - List
PS 29 (3/29/94) MWB
FID. Light Materials and Finish
PS 30 (4/4/94) MWB
ACIS Software Requirements Audit Plan
PS 31 (4/21/94) MWB
Minutes of Science Team Meeting, Phttsburgh 4-15, 1994
PS 32 (4/25/94) SJ
Preliminary Plan for Measuring Effect of Activated Beryllium on X-ray CCD's
PS 33 (5/9/94) MWB
Nousek letter: Effects of Energy Depencence on ACIS-I Layout.
PS 34 (5/18/94) GYP
Results of the CCD Irradication Test
PS 35 (5/19/94) MWB
Summary of Front Illuminated Radiation Test Results: Excerpt from Presentation at ACIS Quarterly Review / ACIS PS Memo 34
PS 36 (5/20/94) MWB
Preliminary Design for ACIS CCD Protective Test Container
PS 37 (5/20/94) MWB
ACIS Flight Detector and Flexprint Pinouts
PS 38 (5/25/94) MWB
Low-Energy Spectral resolution of an ACIS Back-Illuminated Device from MITLL lot#20
PS 39 (5/31/94) PCT
Calibration Source Preliminary Design
PS 40 (6/1/94) MWB
Updated ACIS Detector Pin List
ACIS Group Home Page Previous List Page Next List Page