ACIS Internal Memo 1-20
PS 1 (4/28/93) MWB
- Mtg w/s Schecter: 27 April 93 at CSR ACIS Focal Plane Wiring
Requirements
PS 2 (5/3/93) MWB
- Alignment Requirements for Focal Plane SI's
PS 3 (6/3/93) MWB
- CCID 14 Pinovts
PS 4 (6/29/93) GP
- After Irradiation Annealing
PS 5 (7/7/93) MWB
- ACIS CCID-14 Flex Print Schematic
PS 6 (7/14/93) PJG
- ACIS Program Meetings
PS 7 (8/10/93) MWB
- Effects of Ionizing Radiation on CCD's From B. Burke
PS 8 (9/13/93) MWB
- Notes from IFWG#13, MSFC 31 AUG - 1 SEPT 93
PS 9 (9/20/93) MWB
- ACIS Science Tasks/Key Decisions for Remainder of 1993
PS 10 (10/15/93) MWB
- Flexible Circuit Design for AXAF - Review for Approval
PS 11 (10/15/93) MWB
- Cacciatore Requirement Specification (Prelim).
PS 12 (10/22/93) RF
- Oct. 14, 1993 MIT-MMAG Technical Mtg.
PS 13 (10/29/93) MWB
- "Solar Proton Shielding Calculations for CCD X-ray Detectors on the
AXAF-I Satellite" T. W. Armstrong - B. L. Colborn, SALC (Oct. 93)
PS 14 (11/2/93) MWB
- Proposed ACIS CCD Delivery Schedule, 11-29 ~ 4-94.
PS 15 (11/12/93) MWB
- CCID 10 Pin Assignments
PS 16 (11/15/93) MWB
- Comments on the AXAF-I Obsev. to Sci. Instruments ICD, IF1-20,
24 SEPT. 93
PS 17 (11/18/93) MWB
- Nousek Memo on Analysis of ACIS Flight Focal Plane Arrays
PS 18 (11/18/93) MWB
- Trip Report: Mtg. at Martin Marietta, 17 Nov. 1993.
PS 19 (11/30/93) MWB
- ACIS On Board Flight Calibration Sources, J Nousek.
PS 20 (12/1/93) MWB
- TRW ESD Control Document
ACIS Group Home Page
Next List Page