ACIS Instrument Support - Monthly Progress Report for July 2012 1. ACIS Characterization 1.3 Monitor scientific on-orbit performance of ACIS ... Continued monitoring of ACIS CTI, gain, trailing pixel pulseheight, detector efficiency, corner pixel distribution, spectral line centroid and width, and focal plane temperature. Updated overclock monitoring. Updated monitoring web pages. (http://space.mit.edu/~cgrant/monitor.html) ... Continued work on a paper combining CTI, FWHM and background monitoring results from ACIS and Suzaku. Trying to better quantify the systematic errors in fitting Gaussians to intrinsically non-Gaussian lines. Draft is being reviewed by co-authors. ... Assessed whether new parameter blocks being used for regular ECS observations that reject fewer grades would also be useful for long CTI observations after shutdowns. Compared relative count rates during long observations to the surrounding weeks - little to no difference. New parameter blocks will (eventually) also be used for long CTI measurements. 2. Engineering 2.1 Instrument hardware engineering performance ... Continue to monitor long term ACIS instrument performance. ACIS continues to perform nominally. 2.2 Flight software maintenance ... Reviewed CAP to run long duration CTI measurement after radiation shutdown. 2.3 Instrument science performance ... Participated in monthly ACIS operations meeting. Topics included thermal issues and recent radiation shutdowns. Discussed ACIS team response to anomalies in the case of key personnel being unavailable. ... Assessing what aspects of the MIT ACIS team anomaly response are currently unique to a particular individual. Considering cross-training and better troubleshooting documention to provide better coverage during team member absences. ... Both ACIS and the Chandra OBC are now ready to respond to a radiation trigger from the TXINGs patch. Changing particle background will require revisiting the patch parameters a few times a year. Working on how to provide threshold crossing plots and data automatically for ground assessment during radiation events. ... Two presentations on the TXINGS patch were given at the SPIE Space Telescopes and Instrumentation 2012: Ultraviolet to Gamma Ray conference by P. Ford and C. Grant. Proceedings papers submitted. ... Continued daily quick-look processing of ACIS telemetry and maintained Web interface to ACIS real-time data. ... Continued to publish the "annotated DOT" timeline reports. 3. CXC Support 3.1 Provide user support ... Updated ACIS memo listing calibration ObsIDs and observation characteristics (ACIS Memo #165). 3.2 Provide data analysis support ... Participated in CXC Cal/Ops modeling discussion group. Discussed CC mode calibration (nearly finished), contamination measurements, and gain issues at low energies on S1. ... Answered SDS question regarding ACIS temperature measurement, CTI temperature dependence and calibration of the temperature-dependent CTI correction. ... Provided updated time-dependent CTI fits to the Penn State ACIS team to be incorporated into their CCD simulator. ... Continued to maintain ACIS calibration database of ground and flight data products. 4. OCC Support 4.1 Use of MIT/ACIS EGSE at OCC ... Continued support and maintenance of ACIS EGSE software and hardware at the OCC. Outreach: none