ACIS Instrument Support - Monthly Progress Report for May 2012 1. ACIS Characterization 1.3 Monitor scientific on-orbit performance of ACIS ... Continued monitoring of ACIS CTI, gain, trailing pixel pulseheight, detector efficiency, corner pixel distribution, spectral line centroid and width, and focal plane temperature. Updated monitoring web pages. Small improvements made in web page text and treatment of leap years. (http://space.mit.edu/~cgrant/monitor.html) ... Continued work on a paper combining CTI, FWHM and background monitoring results from ACIS and Suzaku. Continued writing text for nearly completed A&A paper. Trying to better quantify the amount of sacrificial charge from the particle background and how it changes between XIS and ACIS. ... Examined whether current ECS count rate is low enough to allow additional event grades to be telemetered. Accepting all grades except for g255 should not saturate telemetry. A new set of CTI SI modes is being prepared to allow more grades to be telemetered during CTI observations. 2. Engineering 2.1 Instrument hardware engineering performance ... Continue to monitor long term ACIS instrument performance. ACIS continues to perform nominally. 2.3 Instrument science performance ... Participated in monthly ACIS operations meeting. Topics included the May 29 safe mode, the status of the TXINGs patch, the change to grade selection for ECS measurements and thermal issues. ... Continued work optimizing the parameters for the TXINGS patch. Reported on verification of the new ACIS TXINGS parameters at FDB meeting on 17 May. TXINGS patch now running with optimal parameters. Changing particle background will require revisiting the parameters occasionally. ... TXINGS patch correctly signaled a high radiation environment on 17 May, shortly before SCS107 was triggered. ... Chandra OBC patched on May 30. The next ACIS TXINGS trigger should be acted upon by the spacecraft, so ACIS can now hide itself during times of high radiation. ... Two proceedings papers on the TXINGS patch are being prepared for the upcoming SPIE meeting. ... Continued daily quick-look processing of ACIS telemetry and maintained Web interface to ACIS real-time data. ... Continued to publish the "annotated DOT" timeline reports. 3. CXC Support 3.1 Provide user support ... Updated ACIS memo listing calibration ObsIDs and observation characteristics (ACIS Memo #165). 3.2 Provide data analysis support ... Participated in CXC Cal/Ops modeling discussion group. Discussed CC mode calibration (nearly finished), contamination measurements, and gain issues at low energies on S1. ... Supported an SDS-led meeting on single frame overclock anomalies and the best method of finding and fixing them. ... Continued to maintain ACIS calibration database of ground and flight data products. 4. OCC Support 4.1 Use of MIT/ACIS EGSE at OCC ... Continued support and maintenance of ACIS EGSE software and hardware at the OCC. Outreach: none