ACIS Instrument Support - Monthly Progress Report for February 2011 1. ACIS Characterization 1.3 Monitor scientific on-orbit performance of ACIS ... Continued monitoring of ACIS CTI, gain, trailing pixel pulseheight, detector efficiency, corner pixel distribution, spectral line centroid and width, and focal plane temperature. Updated monitoring web pages. (http://space.mit.edu/~cgrant/monitor.html) ... Updated web page examining bias data before and after Crab observations to include most recent one (ObsID 13205 on Feb 16). No changes observed. ... Examined full history of ACIS overclock values. Presented at monthly ACIS operations meeting. Will eventually be incorporated into a monitoring web page. ... Continued work on a paper combining CTI, FWHM and background monitoring results from ACIS and Suzaku. Re-analyzed line fit data (centroid and FWHM of Mn-Kalpha line) for entire mission using the same regions as Suzaku (upper corners). Began comparison. 2. Engineering 2.1 Instrument hardware engineering performance ... Continue to monitor long term ACIS instrument performance. All ACIS engineering parameters continue to operate within predicted limits. 2.3 Instrument science performance ... Continued investigation into whether ACIS can act as it's own radiation monitor, prompted by action from the thermal working group which is concerned about the continued degradation of EPHIN. Reviewing Engineering Change Order 36-1044, Flight Software Standard Patch Release E, Optional Release F. Formal instrument team review scheduled for March 2. ... Examined threshold crossings data around recent solar activity (Feb 18) to see if ACIS patch would have triggered. Rates did not reach high enough levels to trigger a shutdown. ... Participated in monthly ACIS operations meeting. Discussed ACIS patch development, recent overclock levels and thermal issues. ... Participated in radiation working group telecon. ... Continued daily quick-look processing of ACIS telemetry and maintained Web interface to ACIS real-time data. ... Continued to publish the "annotated DOT" timeline reports. 3. CXC Support 3.1 Provide user support ... Updated ACIS memo listing calibration ObsIDs and observation characteristics (ACIS Memo #165). 3.2 Provide data analysis support ... Participated in CXC Cal/Ops modeling discussion group. ... Continued to maintain ACIS calibration database of ground and flight data products. ... Moved to new backup server after old one died. Transfering ACIS monitoring analysis scripts and data to new machine due to ailing hard drive. 4. OCC Support 4.1 Use of MIT/ACIS EGSE at OCC ... Continued support and maintenance of ACIS EGSE software and hardware at the OCC. Outreach: None