ACIS Instrument Support - Monthly Progress Report for August 2010 1. ACIS Characterization 1.1 Characterize and model radiation damage in ACIS CCDs ... Continued work on irradiation/annealing tests done at GSFC in 2005. Writing up as a paper. 1.3 Monitor scientific on-orbit performance of ACIS ... Continued monitoring of ACIS CTI, gain, trailing pixel pulseheight, detector efficiency, corner pixel distribution, spectral line centroid and width, and focal plane temperature. Updated monitoring web pages. (http://space.mit.edu/~cgrant/monitor.html) ... Continued to recalibrate CTI-sacrificial charge correction used in monitoring. Quiescent background rates are now trending downwards as the new solar cycle starts, making recalibration possible (and necessary). ... Confirmed that serial CTI on the FI CCDs remains unmeasurable. ... Prepared slides on ACIS status for upcoming Chandra Quarterly Review. 2. Engineering 2.1 Instrument hardware engineering performance ... Continue to monitor long term ACIS instrument performance. ACIS continues to perform nominally. 2.3 Instrument science performance ... Continued investigation into whether ACIS can act as it's own radiation monitor, prompted by action from the thermal working group which is concerned about the continued degradation of EPHIN. Discussed proposed patch and available EPHIN/ACIS data. ... Participated in monthly ACIS operations meeting. Discussed SOT recommendations for focal plane temperature regulation and using ACIS as a radiation monitor. ... Reviewed SOT memo on suggested guidelines for mission planning to control ACIS focal plane temperatures ... Participated in radiation working group telecon. ... Continued daily quick-look processing of ACIS telemetry and maintained Web interface to ACIS real-time data. ... Continued to publish the "annotated DOT" timeline reports. 3. CXC Support 3.1 Provide user support ... Updated ACIS memo listing calibration ObsIDs and observation characteristics (ACIS Memo #165). ... Investigated odd features in recent S4 data as reported by a Chandra user. Initial investigation indicates they may be residual streak events and are not a new problem. Requested documentation changes to CXC HelpDesk to clarify "destreak" tool. Continuing to ponder the overlap of bad column assignments and S4 streak events. ... Provided information on ACIS gain accuracy and stability for Astro-H SXI team. ... Provided information on ACIS background rates as a function of spacecraft altitude for a proposed future mission. 3.2 Provide data analysis support ... Participated in CXC Cal/Ops modeling discussion group. Discussed status of temperature-dependent CTI correction software and CC-mode calibration. ... Continued to maintain ACIS calibration database of ground and flight data products. 4. OCC Support 4.1 Use of MIT/ACIS EGSE at OCC ... Continued support and maintenance of ACIS EGSE software and hardware at the OCC. Replaced failed disks and verified all is now OK. Outreach: None