ACIS Instrument Support - Monthly Progress Report for October 2007 1. ACIS Characterization 1.1 Characterize and model radiation damage in ACIS CCDs ... Continued work on a paper presenting the results of the radiation damage/reverse annealing tests done at GSFC in 2005. ... Executed new SI modes which allow more grades to be telmetered. These SI modes will be used to compare TE and CC mode grade rejection to help calibrate CC mode. Five ObsIDs (58179, 58169, 58160, 58150, 58144) in October. ... Presentation at Chandra Calibration Workshop on the temperature-dependent CTI correction algorithm. ... Preparing CTI-temperature calibration data for inclusion in the Penn State CTI correction software. 1.3 Monitor scientific on-orbit performance of ACIS ... Continued investigation of bias artifacts believed to be due to long-lived cosmic ray afterglows. Presentation on bias artifacts and "superbiases" at Chandra Calibration Workshop. ... Continued monitoring of ACIS CTI, gain, trailing pixel pulseheight, detector efficiency, corner pixel distribution, and spectral line centroid and width. Updated monitoring web pages. (http://space.mit.edu/~cgrant/monitor.html) 2. Engineering 2.1 Instrument hardware engineering performance ... Continue to monitor long term ACIS instrument performance. The ACIS instrument continues to operate in nominal fashion. ... Five Detector Housing cooling tests were conducted in October. Testing of instrument response to turning off the Detector Housing heaters has shown close correlation to thermal model predictions. Although the margin on focal plane thermal control (the bottom line reason for changing our operating strategy) cannot be measured directly, the model correlations that have been done give us confidence that we can predict the magnitude of the benefit gained by operating in this mode. ... Planning new Detector Housing cooling test during perigee. Temperature should drop much lower and may trigger survival heaters. 2.2 Flight software maintenance 2.3 Instrument science performance ... Reviewed documents and CAPs related to Detector Housing cooling tests. ... Continued daily quick-look processing of ACIS telemetry and maintained Web interface to ACIS real-time data. ... Continued to publish the "annotated DOT" timeline reports. 3. CXC Support 3.1 Provide user support ... Answered user questions about calibration at -100C. Provided suggestions for how to test the validity of scientific conclusions. ... Updated ACIS memo listing calibration ObsIDs and observation characteristics (ACIS Memo #165). 3.2 Provide data analysis support ... Participated in CXC Cal/Ops modeling discussion group. ... Continued to maintain ACIS calibration database of ground and flight data products. 4. OCC Support 4.1 Use of MIT/ACIS EGSE at OCC ... Continued support and maintenance of ACIS EGSE software and hardware at the OCC. ... Continued work on improving configuration management of the ACIS workstations in the TST area of the Chandra OCC. Work nearly complete. Outreach: Mentor to high school students participating in the Chandra Astrophysics Institute (C. Grant) Participated in Cambridge Girls' Science Club meeting (C. Grant, B. LaMarr) all recent memos available at http://space.mit.edu/ACIS/iacis.html