ACIS Instrument Support - Monthly Progress Report for September 2003 1. ACIS Characterization 1.1 Characterize and model radiation damage in ACIS CCDs ... Completed running charge injection tests on I3. Two tests at additional energies. Data analysis will continue. [... Began taking a series of data in full-frame raw mode for performance verification and monitoring. First set includes S2 and S3. Future sets will sample all the CCDs. These are the first such data since September 1999. 1.2 Monitor scientific on-orbit performance of ACIS ... Continued analysis of ExtCalSrc data to study efficiency decrease at low energies. Verifying spatial non-uniformity of contaminant distribution. ... Continued monitoring of ACIS CTI. No significant changes beyond the long term slow increase. (http://space.mit.edu/~cgrant/cti/) ... Continued monitoring of ACIS gain. All CCDs stable with a slow decline in gain slope (ADU/eV) except for I2 which continues to vary. (http://space.mit.edu/~cgrant/gain/). [...] Presented poster at "Four years of Chandra Observations" Symposium on ACIS performance monitoring. 1.4 Update and improve CCD simulation ... Continued work on improving FI and BI CCD models. Added option that allows for specifying precise intrapixel location of incoming photon. ... Worked on the CTI simulation code for the new version of the CCD model. Implemented shifting of charge packet center from a center of a single gate to a center of two gates during clock overlapping period. Implemented spilling of charge packet under 2 gates during clock overlapping period. ... Analyzed another set of data with variable input signal in order to measure volume-vs-charge relationship for very small charge packets. 2. Engineering 2.1 Instrument hardware engineering performance ... Continue to monitor long term ACIS instrument performance. No new anomalies or trends. [... Providing engineering support for planning a possible instrument bakeout. 2.2 Instrument science performance ... Participated in ACIS operations bakeout planning meeting. [...] Updated ground software for the change in the format of ACIS uplink tables to accomodate the expected bias map creation times that Royce will be computing for each ObsID. [...] Annotated and verified the uplink commands for ACIS bakeout. ... Continued daily quick-look processing of ACIS telemetry and maintained Web interface to ACIS real-time data. ... Continued to publish the "annotated DOT" timeline reports. [...] Participated in ACIS telecon. 3. CXC Support 3.1 Provide user support ... Updated ACIS memo listing calibration ObsIDs and observation characteristics (ACIS Memo #165). 3.2 Provide data analysis support [...] Participated in CXC Cal/Ops RMF discussion group. ... Continued to maintain ACIS calibration database of ground and flight data products 4. OCC Support 4.1 Use of MIT/ACIS EGSE at OCC ... Continued support and maintenance of ACIS EGSE software and hardware at the OCC. all recent memos available at http://space.mit.edu/ACIS/iacis.html