ACIS Instrument Support - Monthly Progress Report for December 2002 1. ACIS Characterization 1.1 Characterize and model radiation damage in ACIS CCDs ... Continued running charge injection tests on I0 from the command load. Accumulating more statistics at approximately 1.5 keV with two data sets. [... Begin running charge injection tests on S2 from the command load. Two tests at approximately 4 and 1.3 keV. ... Continued to analyze data from irradiation/bakeout test at GSFC. Found significant reduction of the density of the traps with short time constant after the warm-up from examination of trailing pixel pulseheights. 1.2 Design and characterize alternative CCD readout modes ... Supported charge injection tests on-board with lab verification and testing. Determined new set of DAC values for use with upcoming tests on S2. 1.3 Monitor scientific on-orbit performance of ACIS [...] Participated in Chandra quarterly review. Presented ACIS status report. ... Continued analysis of ExtCalSrc data to search for putative QE decrease at low energies. Discussed influence of F-K edge on Mn/Fe-L line fits with CXC colleagues. Analysis ongoing. ... Continued monitoring of ACIS CTI. No significant changes beyond the long term slow increase. (http://space.mit.edu/~cgrant/cti/) ... Evaluating the correlation of the Chandra Radiation Model fluence with CTI increase. New CRM numbers for mission made available by CXC SOT. Generally correlated, but poor correspondence for some CTI/CRM features. Analysis ongoing. ... Continued monitoring of ACIS gain. All CCDs stable with a slow decline in gain slope (ADU/eV) except for I2 which continues to vary. (http://space.mit.edu/~cgrant/gain/). 1.4 Update and improve CCD simulation ... Continued work on improving FI and BI CCD models with a more physical representation of CTI. 2. Engineering 2.1 Instrument hardware engineering performance [...] ACIS engineering group assisted in restarted ACIS on 12/20/02 after a transient event turned off the primary +5V DC power to the instrument. Event was symptomatically identical to that experienced in October 2000. No cause yet identified. Restart accomplished without incident with no loss of science or CTI data. ... Continue to monitor long term ACIS instrument performance. ... Continue to support thermal monitoring of the PSMC 2.2 Flight software maintainence ... ACIS flight software patches in-house review conducted on August 6 (Rev C). Addressing reviewer comments and recommendations. 2.3 Instrument science performance ... Continued daily quick-look processing of ACIS telemetry and maintained Web interface to ACIS real-time data. ... Continued to publish the "annotated DOT" timeline reports. [...] Participated in ACIS telecons ... Continued to support charge injection operations by reviewing loads and comparing flight data to ground data to select new settings. 3. CXC Support 3.1 Provide user support ... Updated ACIS memo listing calibration ObsIDs and observation characteristics (ACIS Memo #165). 3.2 Provide data analysis support [...] Answered CXC question about analyzing "dark" moon observations. Discussed analysis pitfalls due to optical loading from the bright moon. [...] Reviewed release notes for FI CTI-corrected matrices [...] Submitted Q&A for Chandra Calibration Workshop presentation [...] Participated in CXC Cal/Ops RMF discussion group. ... Continued to maintain ACIS calibration database of ground and flight data products 4. OCC Support 4.1 Use of MIT/ACIS EGSE at OCC ... Continued support and maintenance of ACIS EGSE software and hardware at the OCC. all recent memos available at http://space.mit.edu/ACIS/iacis.html Outreach: None in December